top of page
SOLDIER PILING
& LAGGING
Soldier Pile and Lagging is an earth retention system consisting of steel piles driven or placed in drilled holes. After the soldier beams have been installed, the earth is excavated along one side of the beams to expose a cut face of earth, and to partially expose the front faces of the beams.
Strong Foundation Inc. is experienced with Soldier Piling & Lagging and can consult if this is the right approach for your upcoming project.
bottom of page